Construction project to begin on road surfaces in several neighborhoods

Beginning on Monday October 1, 2018, A Folino Construction Co. will be performing milling and paving along the streets listed below.

Black Oak Dr (Spreading Oak to Florence Dr)
Green Orchard Dr. (Greentree Rd to Green Oak La)
Blackberry Rd (Orchard Spring to Stancey)
Foxwood La (Foxwood Ct to Cul de Sac)
Hammond St (Hammond Bridge to Superior St)
Sell Way (Campbell to Dead End)
Meadow Way (Gregg St to Ash)
Hoff St (Lee St to Creek St)
Ignatius Way (Summit to Paul St)
Front St (Chapel to Hope Way)
Hope Way (Washington Ave to Front St)
Old Greentree Rd. (Lindsay to Dead End and Kerr Rd to Greentree Rd.)
Elmbrook La (Rockhill to Hs # 2034)
Sillview Dr (Somerville to Hs # 1648)
Vanadium Rd (Worcester Dr. to Bower Hill-scratch coating)

*(Additional-2 Partial Lane Repairs on Orchard Spring by Lower Circle and 100 Block from storm washouts)

For the most part, this process will consist of catch basin repairs, milling and repaving. There will be some minor delays in these areas from time to time during this process, and is anticipated to take approximately 3-4 weeks to substantially complete.