Tentative start date for milling next Wednesday 9/23, paving to follow shortly thereafter.
-Tedco (Lindsay to End) /Mary Way North (Tedco to End) /John Street (Tedco to End):
To be restricted to local access only during milling/paving operations. Access to be maintained to residents through periodic restricted lane closures. Periodic temporary restrictions
during construction.
-Lindsay Road North (Greentree to Concrete Pavement Joint):
To be closed during milling/paving operations, a single access to be maintained to the Township/Police Building at all times and reopened upon completion of work. Traffic detours to be facilitated via Ursula Drive.
–Lindsay Road South (Greentree to Old Green Tree) and Old Green Tree Road (Lindsay to Pine Trees):
Local access to be maintained to through periodic restricted lane closures. Periodic temporary restrictions during construction.
- All roadways include roadway resurfacing , full roadway width from back of curb to back of curb.
- Old Greentree Road solely has two small patch areas (consistent with Township standards) due to limited disturbance area.